The client is a major energy provider.
The requirements:

  • Supply a 1 MW inverter and two battery containers with a total capacity of 5.5 MW.

  • Both should be placed on the lower deck of a platform.

  • Support measures for system integration.

Planned duration:
approx. 2 years

Our solution:
A properly scaled battery storage system combined with a hybrid inverter (MSC).

Special features:

The offshore facility will be assembled in Italy and then actively integrated and operated in the North Sea.